Justin Apprill

Justin Apprill

Company: U.S. Engineering

Job title: President

Seminars:

Ensuring Quality at Every Stage of Prefabrication Delivery 1:30 pm

Working with suppliers and owners to enhance the end-to-end logistics of building and supplying prefabricated components Innovating strategies for ensuring vendor quality before builds leave the shop Looking towards manufactured assemblies as an alternative to prefabrication for improving the manufacturing life cycleRead more

day: Pre-Conference Day Track C

A Hanson Wade Group Company

© Copyright 2023 Hanson Wade Ltd | Design and site by Event Engine | Hanson Wade Limited is registered in England & Wales, number 06752216.
Registered Office: Eastcastle House, 27/28 Eastcastle Street, London, W1W 8DH.