Jeff Kiblen
Company: U.S. Engineering
Job title: President of Manufacturing Operations
Seminars:
Ensuring Quality at Every Stage of Prefabrication Delivery 1:30 pm
Working with suppliers and owners to enhance the end-to-end logistics of building and supplying prefabricated components Innovating strategies for ensuring vendor quality before builds leave the shop Looking towards manufactured assemblies as an alternative to prefabrication for improving the manufacturing life cycleRead more
day: Pre-Conference Day Track C