Panel: Effectively Integrating Data Centers to Local Grids to Improve Stability & Tackle Power Demand
Time: 2:20 pm
day: Track 2: Planning, Design & Preconstruction (PM)
Details:
- Outlining the requirements and policy standards needed of data centers for grid integration
- Understanding how the architecture of data center power systems needs to change to optimize integration
- Helping to balance the grid to get permission to build future data centers