3:30 pm Workshop B: Bridging the Gap Between Prefab, Design & Field Teams to Streamline the Installation of Equipment

Time: 3:30 pm
day: Pre Conf Day Track B

Details:

  • Mapping out the roles and responsibilities on a prefab project
  • Determining the line of demarcation: what level of construction should be built onsite to ensure quality expectations are met?
  • Equipping field teams with the necessary skills to correctly install modular units according to design specifications
  • Conducting comprehensive onsite testing to ensure the facility operates correctly after assembly