Case Study: Selecting Methods & Materials That Comply with Live Facility Constraints & Requirements

11:30 am - Thursday 3rd December 2026

  • Understanding how material selections impact structural loading, installation sequencing and long-term maintenance requirements across retrofit projects
  • Identifying when operational requirements necessitate alternative installation approaches to reduce disruption to uptime
  • Choosing alternative piping materials and connection methods that reduce hot work to minimize operational risk

Speakers:

Director of Engineering
Jones Lang LaSalle IP, Inc.