Duane Warren

Director of Engineering Jones Lang LaSalle IP, Inc.

Seminars

Wednesday 2nd December 2026
Panel: Evaluating Existing Space Constraints to Ensure New Equipment Integrates with Legacy Infrastructure Layouts
2:00 pm
  • Creating retrofit layouts that maximize available space while accommodating new equipment, cooling systems and routing requirements within existing facility constraints
  • Coordinating equipment sizing, access pathways and installation sequencing early to reduce fitment issues and prevent deployment delays
  • Assessing how legacy building layouts, freight access limitations and confined space impact equipment selection, installation flexibility and long-term maintainability
Thursday 3rd December 2026
Case Study: Selecting Methods & Materials That Comply with Live Facility Constraints & Requirements
11:30 am
  • Understanding how material selections impact structural loading, installation sequencing and long-term maintenance requirements across retrofit projects
  • Identifying when operational requirements necessitate alternative installation approaches to reduce disruption to uptime
  • Choosing alternative piping materials and connection methods that reduce hot work to minimize operational risk
Duane Warren