Case Study: Overcoming Outdated & Inaccurate Drawings of Existing Infrastructure to Enable Precise Retrofit Design
11:00 am - Thursday 3rd December 2026
- Exploring how Prometheus developed protocols for documenting existing site conditions to create a more reliable foundation for retrofit design and planning
- Assessing how Prometheus improved project predictability and reducing redesigns, schedule delays and operational risk through validated as-built documentation and early identification of hidden infrastructure conflicts
- Identifying how Prometheus leveraged field verification tools such as laser scanning to strengthen design precision and avoid harming the live environment