Ahmed Anwar
Head of Construction Prometheus Group
Seminars
Wednesday 2nd December 2026
Panel: Exploring the Key Drivers Behind Why Owner/Operators Harness Retrofit Projects to Accelerate Capacity Delivery
1:30 pm
- Identifying the operational, capacity and infrastructure warning signs that indicate when retrofit investments become the fastest path to delivering additional compute capacity
- Examining how AI workloads, higher rack densities and evolving technology demands are pushing existing power, cooling and structural systems beyond their original design limits
- Evaluating how retrofit strategies can accelerate capacity deployment, extend facility utilization and bring AI infrastructure online faster than greenfield development
Thursday 3rd December 2026
Case Study: Overcoming Outdated & Inaccurate Drawings of Existing Infrastructure to Enable Precise Retrofit Design
11:00 am
- Exploring how Prometheus developed protocols for documenting existing site conditions to create a more reliable foundation for retrofit design and planning
- Assessing how Prometheus improved project predictability and reducing redesigns, schedule delays and operational risk through validated as-built documentation and early identification of hidden infrastructure conflicts
- Identifying how Prometheus leveraged field verification tools such as laser scanning to strengthen design precision and avoid harming the live environment