Optimising Generator Exhaust Systems to Prevent Performance Failures and Ensure Long-Term Reliability in Hyperscale Data Centers
12:20 pm
  • Managing backpressure in multi-generator configurations to meet manufacturer limits and prevent performance issues
  • Optimising condensate management through joint design, material selection and pipe pitch to minimise corrosion and leakage
  • Addressing thermal expansion, support spacing and joint design to ensure long-term structural integrity and operational safety
  • Comparing prefabricated UL-listed systems with field-welded carbon steel solutions to evaluate compliance and performance