Case Study: From Offsite Testing to Turnover: Reducing Risk & Accelerating Commissioning
11:30 am - Thursday 3rd December 2026
- Understanding why controls integration often becomes a critical path to final system testing, acceptance, and handover.
- Identifying how unresolved design, installation, programming, and interface issues create delays during commissioning.
- Using offsite simulation, testing, and pre-validation of sequences of operation to uncover issues earlier and reduce onsite rework.
- Establishing clear readiness criteria and cross-team coordination to ensure equipment, controls, networks, programming, and system dependencies are resolved before integrated testing begins.