Case Study: Commissioning Liquid Cooling Systems to Support High-Density Infrastructure
10:30 am - Thursday 3rd December 2026
- Understanding how strict cleanliness requirements impact commissioning timelines and increase the risk of delays
- Exploring the challenges of simulating real operating conditions (e.g. rack loads and flow rates) during system commissioning
- Examining how mechanical design is adapting to meet stricter water quality requirements, including filtration, materials, and system layout