PurgeRite
As AI accelerates and data center cooling densities rise, the complexity of chilled water systems has never been greater. While engineers design these systems for optimal operation, they are not designed to be flushed—yet proper flushing is essential to ensure performance, reliability, and longevity. PurgeRite is the industry leader in engineered flushing solutions for complex data center environments. We specialize in achieving superior flushing via high-velocity water flows required to properly purge these systems.