Intelligent Mapping

Intelligent Mapping is a U.S.-based technology innovator founded in 2020 with a simple mission: eliminate uncertainty in underground utility and conduit infrastructure. Our PLUM™ technology, a proprietary inertial mapping device, travels through installed conduit to capture survey-grade XYZ positioning, bend radius, bend angle, elevation changes, coupler locations and other critical spatial information. The resulting digitally verified records provide three-dimensional visibility into subsurface conduit infrastructure, delivering a precise representation of as-built conditions that can be integrated into CAD and GIS workflows. By verifying infrastructure before cable installation, Intelligent Mapping enables data center and long-haul network teams to preemptively identify construction variances, validate conduit against engineered specifications, mitigate installation risk and reduce costly rework and delays. The result is a powerful QA/QC process that transforms underground uncertainty into decision intelligence.

www.intelligentmapping.com

Intelligent Mapping
Intelligent Mapping