EPD

Electronic Power Design (EPD) is a leading U.S. manufacturer of low-voltage electrical distribution equipment. Since 1986, we have partnered with data centers, healthcare facilities, commercial campuses, and industrial plants to deliver power solutions that never compromise on safety, reliability, or performance. From initial concept and in-house engineering through UL certification and on-time delivery, EPD offers the expertise and flexibility to meet our customers’ most demanding electrical requirements. At EPD, we don’t just build switchboards, we engineer reliability. Our in-house teams of engineers, fabricators, and technicians work side-by-side to design and manufacture equipment that performs in the most demanding environments. Every product is made in our Houston facility, ensuring quality control, faster lead times, and a hands-on approach that larger suppliers can’t match.

www.electronicpowerdesign.com

EPD-Classic-Stacked-Logo-300x150
EPD-Classic-Stacked-Logo-300x150