John Major

John Major

Company: Page

Job title: Principal

Seminars:

Case Study: Revealing How Two-Phase Liquid Immersion Cooling (2-PIC) Reduces Energy & Water Consumption 3:10 pm

Understanding how Two-Phase Liquid Immersion Cooling changes the physical data center design and current considerations for design and implementation Reducing costs with 2-PIC: What are the savings with Two-Phase Liquid Immersion Cooling at hyperscale compared to a traditional Direct Evaporative Cooling air-cooled data center? Understanding the changing design topologies for Mechanical, Electrical and Telecom engineering,…Read more

day: DAY 1 TRACK 1 PM

© Copyright 2023 Hanson Wade | Design and site by Event Engine | Hanson Wade Limited is registered in England & Wales, number 06752216.
Registered Office: Eastcastle House, 27/28 Eastcastle Street, London, W1W 8DH.