Brad Wiggins

Brad Wiggins

Company: EAE

Job title: Engineering Manager

Seminars:

Collaboration, Prefab & the Future 2:20 pm

Mapping out the steps of a collaborate design workflow from the manufacturer’s perspective to achieve your goals Revealing how power distribution partners can maximize offsite preconstruction to reduce risk and supply chain delays Highlighting the challenges and lessons learned from collaborative projectsRead more

day: DAY 1 TRACK 2 AM

© Copyright 2023 Hanson Wade | Design and site by Event Engine | Hanson Wade Limited is registered in England & Wales, number 06752216.
Registered Office: Eastcastle House, 27/28 Eastcastle Street, London, W1W 8DH.